Charging masterpieces
You spend months on a façade. We make sure the last object on or in front of it belongs there too.
Conduits, routing, capacity: leave it until the drawings are fixed and you pay for it in demolition work, a surface-mounted conduit, or a grey box on the best façade of the project. Taking it along early costs you half an hour. Solving it late costs a compromise. We design and build premium EV chargers in-house, in Belgium. Winner of the Red Dot and iF Design Award, though what will matter more to you: the same care for material and detail you put into the rest of the building. Seamless finish, concealed fixings, cable routing out of sight.
All six return in every project, and all six should be settled before the plan is final. The numbers differ per model: the Architect Kit below holds a checklist that points to the right line on each spec sheet, sheets also included.
Get the download right here on the page, no waiting.
I have a project in the design stage where this comes up
Input on a design or a custom cover, a missing file, an indicative price for an estimate. Or simply to get acquainted with our brand.